MAINTENANCE
3Ć3
186 MM159 (6–94)
RECOMMENDED FIRST 25-HOUR MACHINE INSPECTION
After the first 25 hours of operation, the following
procedures are recommended:
1. Check the brush pattern for correct brush
adjustment.
2. Check the floor skirts to floor clearance.
3. Check the side brush and main brush
patterns.
4. Check the drive chain tension.
Summary of Contents for 186