OPERATION
2-23
1465/1480/1490 MM185 (11--92)
MACHINE TIE--DOWNS
The machine may be tied down at each corner of
the main frame using the tie-down brackets
supplied in the tie-down kit.
A
A
04366
FRONT TIE--DOWN LOCATIONS
A. Tie--Down Bracket
A
A
04382
REAR TIE--DOWN LOCATION
A. Tie--Down Bracket
When transporting the machine on a trailer or in a
truck, be sure to engage the machine parking
brake if present and block the machine tires to
prevent the machine from rolling.
Summary of Contents for 1465
Page 1: ...1465 1480 1490 MM185 Rev 11 9 94 ...
Page 10: ...SPECIFICATIONS 1465 1485 1490 MM185 9 90 1Ć2 ...
Page 18: ...OPERATION 1465 1480 1490 MM185 9 90 2 2 ...
Page 42: ...MAINTENANCE 1465 1480 1490 MM185 9 90 3Ć2 ...
Page 49: ...MAINTENANCE 3Ć9 1465 1480 1490MM185 11 92 05097 ELECTRICAL SCHEMATIC ...