OPERATION
2-3
1465/1480/1490 MM185 (9--91)
PREPARATION FOR OPERATION
AFTER UNCRATING AND BEFORE
OPERATING MACHINE:
1. Check the machine for shipping damage.
2. Read this manual carefully before operating
or servicing the machine.
FOR SAFETY: Do Not Operate The Machine
Unless Operation Manual Is Read And
Understood.
3. Lift open the machine hood, then tilt open
the battery cover.
B
A
C
04342
OPEN BATTERY COVERS
A. Front Cover
B. Rear Cover
C. Batteries
4. Check the batteries electrolyte level as
described in
BATTERIES
in the
MAINTENANCE
section.
A
B
00879
CHECKING BATTERY ELECTROLYTE LEVEL
A. Battery
B. Electrolyte Indicator Ring
FOR SAFETY: When Servicing Machine, Avoid
Contact With Battery Acid.
5. Check the battery specific gravity to
determine the state of charge as described
in
BATTERIES
in the
MAINTENANCE
section. Charge the batteries if necessary.
6. Connect the battery connector to the
machine connector.
B
A
04343
CONNECTING BATTERY CONNECTORS
A. Machine Connector
B. Battery Connector
7. Install scrub brushes as described in
SCRUB BRUSHES
in the
MAINTENANCE
section.
8. Pre-Sweep
t
machines: Install Pre-Sweep
t
assembly as described in
TO MOUNT
PRE-SWEEP
t
.
Summary of Contents for 1465
Page 1: ...1465 1480 1490 MM185 Rev 11 9 94 ...
Page 10: ...SPECIFICATIONS 1465 1485 1490 MM185 9 90 1Ć2 ...
Page 18: ...OPERATION 1465 1480 1490 MM185 9 90 2 2 ...
Page 42: ...MAINTENANCE 1465 1480 1490 MM185 9 90 3Ć2 ...
Page 49: ...MAINTENANCE 3Ć9 1465 1480 1490MM185 11 92 05097 ELECTRICAL SCHEMATIC ...