OPERATION
1465/1480/1490 MM185 (9--91)
2-14
POST OPERATION CHECKLIST -- MACHINE
OFF
Check for wire or string tangled on the scrub
brushes.
Check the squeegees for wear or damage.
Drain and clean the recovery tank.
ES
t
machines: Drain and clean the solution tank.
Back flush the pump and hoses.
Check the vacuum hoses for debris or
obstructions.
Check for leaks.
DOUBLE SCRUBBING OPERATION
Double scrubbing is a method of removing heavy
accumulations of soilage, dirt, wax, or spills. It
involves making two passes over the area to be
cleaned.
To double scrub, make a single pass over the
surface being cleaned with the squeegee up and
the vacuum system off. This dispenses solution
and allows the brushes to scrub the debris loose.
Allow the solution to soak on the floor for 15 to 20
minutes. Then make a second scrubbing pass in
the normal manner with the squeegee down.
OPERATION ON GRADES
Drive the machine slowly on grades.
FOR SAFETY: When Using Machine, Go Slow
On Grades And Slippery Surfaces.
The maximum rated climb and descent angle is
6
_
for all machines.
When descending ramps, control machine speed
by using the steering handles to reduce the
forward speed. The motor controls provide a
natural braking action.
When climbing ramps, if the drive motor circuit
breaker trips, walk the machine down the ramp to
a level surface where the circuit breaker may be
reset.
Summary of Contents for 1465
Page 1: ...1465 1480 1490 MM185 Rev 11 9 94 ...
Page 10: ...SPECIFICATIONS 1465 1485 1490 MM185 9 90 1Ć2 ...
Page 18: ...OPERATION 1465 1480 1490 MM185 9 90 2 2 ...
Page 42: ...MAINTENANCE 1465 1480 1490 MM185 9 90 3Ć2 ...
Page 49: ...MAINTENANCE 3Ć9 1465 1480 1490MM185 11 92 05097 ELECTRICAL SCHEMATIC ...