PN 76.8820IM30-A
Tellabs 8820 Multi-service Switch Router System Installation
2-4
Unpacking and Site Preparation
Unpacking the 8820 MSR
Uncrate and Inspect
Step 3
Disassemble the cardboard carton.
a
Open the top lid. You can now see the 8820 MSR accessory box and the 8820
MSR chassis in its own plastic wrap surrounded by protective foam pads
Figure 2-2
8820 MSR Open Cardboard Box Showing Accessory Box and Chassis
b.
Remove the accessory box and set it aside.
c.
Place your hands at opposite sides of the foam pads around the 8820 MSR
chassis, and lift the 8820 MSR chassis up and away from the main 8820 MSR
cardboard carton.
d.
Remove the plastic wrap from the chassis and set it aside.
Step 4
Use standard operating procedures (according to your site safety guidelines) to
carefully lift the 8820 MSR to and place it on the ground or on a cart for transport
to the installation site.
C
AUTION
Use safe lifting practices when removing the 8820 MSR from the shipping
carton. If possible obtain assistance from a second person to remove the 8820
MSR from the packaging.