PN 76.8820IM30-A

Tellabs 8820 Multi-service Switch Router System Installation

2-4

  

Unpacking and Site Preparation

Unpacking the 8820 MSR

  Uncrate and Inspect

Step 3

Disassemble the cardboard carton.

a

Open the top lid. You can now see the 8820 MSR accessory box and the 8820 
MSR chassis in its own plastic wrap surrounded by protective foam pads 

(Figure 2-2)

.

Figure 2-2

8820 MSR Open Cardboard Box Showing Accessory Box and Chassis

b.

Remove the accessory box and set it aside. 

c.

Place your hands at opposite sides of the foam pads around the 8820 MSR 
chassis, and lift the 8820 MSR chassis up and away from the main 8820 MSR 
cardboard carton. 

d.

Remove the plastic wrap from the chassis and set it aside. 

Step 4

Use standard operating procedures (according to your site safety guidelines) to 
carefully lift the 8820 MSR to and place it on the ground or on a cart for transport 
to the installation site. 

C

AUTION

Use safe lifting practices when removing the 8820 MSR from the shipping 
carton. If possible obtain assistance from a second person to remove the 8820 
MSR from the packaging.

Summary of Contents for 8820 MSR

Page 1: ...Revision A Copyright 2003 Tellabs All rights reserved System Installation 76 8820IM30 A Tellabs 8820 Multi service Switch Router...

Page 2: ...appareil num rique de la classe A est conforme la norme NMB 003 du Canada Copyright Statement This Tellabs manual is owned by Tellabs or its licensors and protected by U S and international copyright...

Page 3: ...rce 1 2 3 Position and Cable the 8820 MSR 1 2 4 Initialize the 8820 MSR 1 2 Installation Checklist 1 3 CHAPTER 2 Unpacking and Site Preparation Safety Information 2 2 Unpacking the 8820 MSR 2 2 Uncrat...

Page 4: ...nt Panel 3 2 LED Indicators 3 3 ACO Button 3 4 Serial Connector 3 4 Ethernet Connector 3 4 Alarms 3 4 Rear Panel 3 5 Fan Module Assembly 3 5 Power Panels 3 5 Physical Line Modules 3 7 PLM Blank Panel...

Page 5: ...2 8820 MSR System Management and Alarm Specifications A 2 DC Power Requirements A 2 AC Power Requirements A 3 Optical PLMs and Power Requirements A 4 OC 3 PLMs A 5 OC 12 PLMs A 6 OC 48 PLMs A 7 Other...

Page 6: ...PN 76 8820IM30 A Tellabs 8820 Multi service Switch Router MSR System Installation vi...

Page 7: ...installing powering up testing and servicing the Tellabs 8820 Multi service Switch Router MSR After completing the procedures in this installation guide you can start managing and configuring the 8820...

Page 8: ...mation for unpacking and mounting the 8820 MSR and for connecting it to the external facilities Chapter 3 Equipment Overview describes the 8820 MSR chassis and all installable components This chapter...

Page 9: ...product must observe these warnings and all other safety precautions necessary to ensure your personal safety as well as the continued safe operation of the 8820 MSR in your operating environment ARNI...

Page 10: ...n page 2 10 AC Power To minimize shock hazard the 8820 MSR must be connected to an electrical ground The AC version of the 8820 MSR is supplied with a three conductor AC power cable The power cable mu...

Page 11: ...nical Support to determine if the Lithium battery is the source of any defective operations on the 8820 MSR and do not attempt to change the battery without the assistance of authorized Tellabs servic...

Page 12: ...n be damaged by static electricity that builds up on work surfaces and on your body Static is produced by the everyday movement of your body and is released as an Electro Static Discharge ESD when you...

Page 13: ...ired for installing a Tellabs 8820 Multi service Switch Router MSR after all components have been removed from the shipping crate site preparation is complete and all components have been inspected In...

Page 14: ...4 8 for details 3 Position and Cable the 8820 MSR Prior to installing the 8820 MSR in a rack you may need to install the mounting brackets provided with the equipment Step 1 Install the 8820 MSR on p...

Page 15: ...assis to earth ground Connecting DC Power Feeds on page 4 9 Connect the 8820 MSR to a UPS protected power source Install physical line modules PLMs Optional Inserting the PLMs on page 4 12 Connect the...

Page 16: ...PN 76 8820IM30 A Tellabs 8820 Multi service Switch Router System Installation 1 4 Installation Overview InstallationChecklist...

Page 17: ...aration requirements and provides guidelines for preparing the 8820 MSR for installation in the following sections Safety Information on page 2 2 Unpacking the 8820 MSR on page 2 2 Site Preparation on...

Page 18: ...820 MSR arrives in at least two crates one of which contains the 8820 MSR chassis and other s that contain the Physical Line Modules PLMs This section guides you through the unpacking process in the f...

Page 19: ...20 MSR Crate Inspection and Disassembly When unpacking the 8820 MSR you will first disassemble the wood crate then remove the chassis and accessory box from its internal cardboard carton and plastic w...

Page 20: ...the accessory box and set it aside c Place your hands at opposite sides of the foam pads around the 8820 MSR chassis and lift the 8820 MSR chassis up and away from the main 8820 MSR cardboard carton...

Page 21: ...PLM carton and inspect for damage Table 2 1 8820 MSR Accessory Box Contents Item Description Part Number Mounting hardware 10 32 and 12 24 mounting screws for 8860 Multi service Switch Router rack mo...

Page 22: ...re missing contact the Tellabs Advanced Data Products Technical Support Center Table 2 2 Contacting Technical Support Returning Products to Tellabs Use the procedure in this section to authorize retur...

Page 23: ...M Description and Cable Connection on page 2 12 Fast Ethernet PLM Details on page 2 14 Tools and Supplies Requirements This section lists the tools and supplies typically required to perform a 8820 MS...

Page 24: ...parately Table 2 4 DC Power Feed Installation Supplies Item Description Ring lug crimping tool Able to crimp 14 12 AWG wire Able to cut 24 10 AWG stranded wire Able to strip 24 10 AWG stranded wire Wi...

Page 25: ...efined in U S Articles 10 116 10 117 and 10 118 of the National Electrical Code ANSI NFPA 70 and as advised by the labelling on the 8820 MSR Power Panels on page 3 5 Table 2 5 Environmental Requiremen...

Page 26: ...f the unit is installed in a redundant power application both feeds must be connected and compliant with the minimum requirements Power circuit breakers and earth ground connections are presented in T...

Page 27: ...equipped with a standard IEC 320 AC receptacle on the rear panel The unit s single AC feed must meet the minimum requirements detailed in Table 2 8 Table 2 8 AC Power Supply Operating Range Descriptio...

Page 28: ...PLM Description Cable Type and Connector Per Port OC 48 81 8800 PLM048 10 OC 48 STM 16 MS SMF SR Single mode LC connector 81 8800 PLM048 20 OC 48 STM 16 MS SMF IR Single mode LC connector 81 8800 PLM0...

Page 29: ...1 MS SMF IR Single mode LC connector 81 8800 PLM003C 30 OC 3C STM 1 MS SMF LR Single mode LC connector 81 8800 PLM003C 30 OC 3C STM 1 MS MMF SR Multimode MT RJ connector Gigabit Ethernet 81 8800 PLMG...

Page 30: ...LM Type PLM Product Code PLM Description Connector Type Fast Ethernet 81 8800 PLMFE 10 24 Port Fast Ethernet 10 100Base TX PLM 2xMini RJ21 Table 2 11 Fast Ethernet Spares and Accessories Product Code...

Page 31: ...LM Type PLM Product Code PLM Description Connector Type DS3 Clear Channel 81 8800 PLMT3E3 10 6 port clear channel DS3 E3 PLM SMB DS3 Channelized 81 8800 PLMCD3P 10 6 port channelized DS3 DS3 DS1 DS0 P...

Page 32: ...PN 76 8820IM30 A Tellabs 8820 Multi service Switch Router System Installation 2 16 Unpacking and Site PreparationDS3 Clear Channel and Channelized PLM Details Power Requirements...

Page 33: ...Router System Installation 3 1 CHAPTER 3 Equipment Overview This chapter describes the 8820 MSR hardware components in the following sections 8820 MSR Chassis on page 3 2 Physical Line Modules on pag...

Page 34: ...1 8820 MSR Chassis Front Front Panel The front panel of the 8820 MSR provides access to system ports and status indicators and includes the following components Figure 3 2 Figure 3 2 8820 MSR System P...

Page 35: ...tus of the fans system temperature and operational status Table 3 1 Alarm LEDs The 8820 MSR alarm LEDs indicate severity of problems detected by the system Severity is immediately apparent as a result...

Page 36: ...ort to log on run diagnostics and perform troubleshooting on the 8820 MSR as dependent on your physical configuration Ethernet Connector The Ethernet ENET connector is a 10 100 Base T Ethernet RJ 45 c...

Page 37: ...stem This is a field replaceable unit FRU Internal temperatures that exceed thresholds are reported to the Tellabs 8890 Management System and indicated as a temperature fail red LED on the system pane...

Page 38: ...The 8820 MSR accommodates redundant power feeds The unit can operate on only one feed that meets the minimum requirements as presented in Table 2 6 If the unit is installed in a redundant power applic...

Page 39: ...enables access by means of the craft terminal for setting parameters accessing internal registers and other tasks typically performed by craft personnel A high speed data bus transmits packets between...

Page 40: ...ce Switch Router System Installation 3 8 Equipment Overview PLM Blank Panel Rear Panel PLM Blank Panel The PLM blank panel maintains proper airflow through the system All system slots not occupied by...

Page 41: ...ctions Install the 8820 MSR on page 4 3 Connect Power on page 4 8 Load the Chassis Optional on page 4 11 Connect 8820 MSR Alarm Outputs on page 4 14 Connect the Local Console to the 8820 MSR on page 4...

Page 42: ...on the front panel of the 8820 MSR unit when working with the system Electro Static Discharge can seriously damage the printed circuit card assemblies and solid state components inside the 8820 MSR NO...

Page 43: ...into a 19 inch Rack on page 4 5 Installing the 8820 MSR into a 23 inch Rack on page 4 6 Installing the 8820 MSR into an Enclosed Cabinet on page 4 7 NOTE The 8820 MSR installs through the front of the...

Page 44: ...0 A Tellabs 8820 Multi service Switch Router System Installation 4 4 Installation Install the 8820 MSR Figure 4 1 8820 MSR 19 inch Mid Mount Figure 4 2 8820 MSR 19 inch Front Mount 19 inch Flanges 19...

Page 45: ...h as detailed in Figure 4 2 on the 8820 MSR Step 2 With the help of an assistant lift and align the unit into pace at the rack One person must be positioned at the rear side of the rack to balance the...

Page 46: ...Step 2 With the help of an assistant lift and align the unit into place at the rack One person must be positioned at the rear side of the rack to balance the 8820 MSR while the other person balances t...

Page 47: ...hen installing the 8820 MSR chassis Step 2 Attach mounting brackets to the 8820 MSR Figure 4 4 as follows Four screws for the front left side Four screws for the front right side Four screws for the b...

Page 48: ...tep 2 Locate the AC power cable Step 3 Attach the AC power cable to the Viva5100 AC receptacle Step 4 Attach a safety ground cable to the threaded stud next to the AC receptacle Step 5 Attach the othe...

Page 49: ...position If they are not in the OFF O position set them to OFF O position Step 2 Attach a green safety ground cable to the 8820 MSR chassis GND stud Figure 4 6 Figure 4 6 8820 MSR DC Power Panel NOTE...

Page 50: ...ector Use the Molex hand crimping tool 63811 1100 Contacts and connector housings are supplied in the DC power kit Install the contacts per the manufacturer s instructions The DC power kit allows you...

Page 51: ...lank Panels on page 4 13 The additional 8820 MSR PLMs are packed in a separate shipping container Install them in the chassis after you mount the unit in the rack The 8820 MSR provides four single wid...

Page 52: ...to that slot Make sure the extractors are fully extracted Step 3 When the extractors are in position gently close the extractors Figure 4 9 You will feel the PLM pop into its slot Figure 4 9 PLM Inser...

Page 53: ...uter System Installation Install Blank Panels Blank panels are provided with the 8820 MSR All unused PLM slots must be covered with a blank panel Figure 4 10 Step 1 Insert the PLM blank panel into the...

Page 54: ...ither the normally open N O or normally closed N C leads to the alarm annunciator or other external alarm system Whenever the 8820 MSR declares an alarm that system will provide visual and audible ind...

Page 55: ...nector adapters to connect the local console to the serial console port of the system The console connector pinouts are given in Console Serial Connector on page A 15 and the adapter pin cross connect...

Page 56: ...nel presented in Figure 3 2 Step 3 Watch the console monitor to ensure that the system boot messages are displayed and wait until the system presents the following prompt Attempting auto boot press ES...

Page 57: ...guidelines provided in the section entitled Setting Boot Parameters on page B 1 Log Into the 8820 MSR Console Interface When you connect to the 8860 Multi service Switch Router and establish a managem...

Page 58: ...prompt 8820 logout Change the Default Password When the 8820 MSR switch is first powered up it provides two default logins at the CLI for two user types root and admin Table 4 2 The 8860 Multi servic...

Page 59: ...prompt you to change the password CHANGE ALL DEFAULT PASSWORDS IN 5 MINUTES OTHERWISE YOUR SESSION WILL BE TERMINATED Step 3 8820 Password my ropassword 8820 Password my rwpassword Set the get read o...

Page 60: ...ch to a management IP network connect the cable from the 8820 MSR Ethernet port to a management IP network port Connect to the IP Management Network You will need network parameters using information...

Page 61: ...MSR Physical Specifications on page A 2 8820 MSR System Management and Alarm Specifications on page A 2 DC Power Requirements on page A 2 AC Power Requirements on page A 3 Optical PLMs and Power Requ...

Page 62: ...emise Alarm DB 25 connector Alarm Cut Off ACO switch LED for Power Temp Fan Status and Alarm Critical Major and Minor DC Power Requirements Table A 1 Physical Specifications Characteristic Detail Heig...

Page 63: ...nts Table A 3 AC Power Requirements Characteristic Detail AC chassis Single AC power cord input Voltage 85 VAC to 264 VAC Frequency 50 Hz to 60 Hz Current 4 4 Amps Maximum 85VAC Feed Wire 10 Amps 125...

Page 64: ...stem Installation A 4 Optical PLMs and Power Requirements Optical PLMs and Power Requirements The following sections provide the optical power requirement specifications for all SONET SDH PLMs OC 3 PL...

Page 65: ...FR TDM protocols over SONET SDH per port Multiple levels of line and system diagnostic loopback modes per port SONET SDH compliant with Bellcore GR 253 ITU G 707 and ANSI T1 105 1995 Figure A 1 OC 3...

Page 66: ...s per port or concatenated OC 12c STM 4c one OC 12c STM 4c channel per port PPP ATM FR protocol over SONET SDH per port Per channel ATM cell or POS frame payload SONET SDH compliant with Bellcore GR 2...

Page 67: ...T SDH per port Per channel ATM cell or POS frame payload SONET SDH compliant with Bellcore GR 253 ITU G 707 and ANSI T1 105 1995 Figure A 3 OC 48 STM 16 PLM Faceplate Table A 6 OC 48 PLM Optical Power...

Page 68: ...lation A 8 Other PLMs OC 48 PLMs Other PLMs The following sections provide faceplate descriptions and power requirements for Ethernet and DS3 PLMS GigE PLMs on page A 9 Fast Ethernet PLM on page A 10...

Page 69: ...s per port Supports IEEE 802 3z standards including auto negotiation and flow control per port Figure A 4 Gigabit Ethernet PLM Faceplate Table A 7 GigE Optical Power Requirements Description Applicati...

Page 70: ...tandards for Ethernet standard 100 meter support Multiple levels of line and system diagnostic loopbacks Supports IEEE 802 3x and 802 3z standards including auto negotiation and flow control per port...

Page 71: ...any Tellabs 8800 series MSR The DS3 PLM supports 6 ports of T3 or E3 by using six pairs of SMB connectors Faceplate Detail Provides 6 clear channel T3 DS3 or E3 ports Supports connectivity using 6 pa...

Page 72: ...mbinations of nxDS1 or nxDS0 by using six pairs of SMB connectors This PLM also supports clear channel DS3 or E3 Faceplate Detail Provides 6 channleized DS3 ports Supports valid combinations of nxDS1...

Page 73: ...nvironmental Requirements Characteristic Detail Operating temperature 0 C 32 F to 45 C 113 F Operating humidity 5 to 90 RH non condensing Storage and transit temperature 40 C 40 F to 70 C 158 F Storag...

Page 74: ...and Compliance Specifications Characteristic Detail Safety CSA C22 2 No 950 UL 1950 3rd Edition EN 60950 EN 60825 1 2 EMC FCC Part 15 class A EN 55022 Class A Europe VCCI Class A Japan Immunity EN 610...

Page 75: ...r and adapter information as follows Console Serial Connector DB9 to RJ45 Connector Adapters External Alarm Connector Ethernet IP Management Connector Console Serial Connector The serial connector for...

Page 76: ...r Adapters Table A 11 lists the pin to pin cross connections of the two RJ 45 female to DB 9 female connector adapters furnished with the 8820 MSR Use these adapters when connecting a local console to...

Page 77: ...s and an ACO input Pinouts for the external alarm interface are shown in Table A 12 Table A 12 External Alarm Pinouts Pin Number Signal Pin Number Signal Pin Number Signal 1 ACrit N O 10 N C 19 VCrit...

Page 78: ...t Connector Ethernet IP Management Connector The Ethernet ENET connector is a 10 100 Base T Ethernet RJ 45 connector This port provides networks management access to the 8820 MSR Table A 13 details th...

Page 79: ...s Table A 14 lists the port densities for the 8820 MSR PLMs Table A 14 PLM Port Densities Physical Interfaces Per PLM Per 8820 MSR Per 7 ft Rack OC 48 STM 16 1 4 56 OC 48c STM 16c 1 4 56 OC 12 STM 4 4...

Page 80: ...PN 76 8820IM30 A Tellabs 8820 Multi service Switch Router System Installation A 20 Port Densities Ethernet IP Management Connector...

Page 81: ...s A condensed boot sequence example in which the validation and loading progress of software components and modules have been omitted to avoid showing repetitive information Only the final confirmatio...

Page 82: ...then press the Enter key to progress through each field in this display If you need to modify current boot settings see Step 4 Enter a period and then press the Enter key to leave dc configuration mod...

Page 83: ...Yes Ethernet port rate 10 100 Mbps Only used if auto negotiation is disabled 100 Ethernet duplex half full Only used if auto negotiation is disabled Full Client IP address 10 8 4 63 Network IP mask 2...

Page 84: ...ying image checksum Loading image ELF file is a PowerPC executable Module entry point is at 00200000 Section 0 Address 00200000 Size 1337312 1337312 Section 1 Address 003467E0 Size 8 8 Section 2 Addre...

Page 85: ...UILDSYS1 Platform Tellabs 8820 IP Address 10 8 4 63 Disk 1 GB sw1 Local Time Mon Dec 08 00 41 25 2003 Core components loaded All components validated Initialization complete Active software version ac...

Page 86: ...hange password for root Read only Password admin Confirm read only Password admin Read write Password admin Confirm read write Password admin Change password for admin Read only Password viva Confirm...

Page 87: ...attery 2 10 battery return lines 2 10 C cable bundling 2 7 identification tags 2 7 COM port configuration 4 15 CP module 4 11 CPX 1000 installation requirements 2 1 3 1 4 1 safety precautions 3 ix D D...

Page 88: ...A 5 OC 3 TDM PLM product code and cable requirements 2 13 OC 3c PLM port density A 19 product code and cable requirements 2 13 OC 48 PLM faceplate and power requirements A 7 port density A 19 product...

Reviews: