Tellabs 8820 Multi-service Switch Router System Installation
1-1
CHAPTER 1
Installation Overview
This chapter introduces the task sequence typically required for
installing a Tellabs® 8820 Multi-service Switch Router (MSR)
after all components have been removed from the shipping crate,
site preparation is complete, and all components have been
inspected. Installation overviews are provided in the following
sections of this chapter:
❑
Overall Installation Sequence, on page 1-2
❑