Site Preparation
Tools and Supplies Requirements
Unpacking and Site Preparation
2-7
PN 76.8820IM30-A
Tellabs 8820 Multi-service Switch Router System Installation
Site Preparation
Use guidelines in this section to ensure that you have the proper tools and operational
conditions on hand for installing the 8820 MSR. This section describes how to prepare the
8820 MSR installation site, in the following sections:
❑
Tools and Supplies Requirements, on page 2-7
❑
Rack Requirements, on page 2-8
❑
Environmental Requirements, on page 2-9
❑
Power Requirements, on page 2-10
❑
Optical Network PLM Description and Cable Connection, on page 2-12
❑
Fast Ethernet PLM Details, on page 2-14
Tools and Supplies Requirements
This section lists the tools and supplies typically required to perform a 8820 MSR
installation.
contains the rack mounting and general handling suggestions.
Table 2-3
Tools and Supplies for 8820 MSR Installation
Item
Description
Flat-blade screwdriver
#0
Phillips screwdriver
#1 and #2
ESD wrist grounding strap
ESD wrist grounding strap with 170 plug termination (stan-
dard banana plug), as included in the accessory box.
Cable bundling material
Cable ties or waxed twine (depending on the requirements of
the site where the 8820 MSR is installed), or similar.
Cable identification tags
Cable labelling system currently in place in your installation
site.