Installation Instructions
TDS6UP, TDS7UP, and CSA7UP Option CPU Upgrade Kit
15
CD drive
CD drive Interface
board
Microprocessor,
fan and heat sink
Fan assembly
Front panel
assembly
Rear
distribution
board
Front
distribution
board
Low-voltage power
supply assembly
Power PC (PPC)
board
Riser board
Front panel
board
Front panel
keypad
Floppy disk drive
Display module assembly
Power flex circuit
Display adapter board
NLX board
Hard drive
PA bus
board
Acquisition board
Figure 7: Internal modules
2.
Remove the NLX Board assembly:
See Figure 8 on page 17.
3.
Orient the instrument:
Set the instrument so that the bottom is down on the
work surface and the top panel is facing you.
a.
Remove the two T-15 Torx screws that secure the floppy disk drive
assembly into the front chassis.