Adjustment Procedure
7–8
1710J-Series Waveform Monitors
2. Use a 75
W
coaxial cable to connect the multiburst output from the television
test signal generator to one side of the CH A input loop-through. See
Figure 7–4.
3. Use a 75
W
coaxial cable to connect the digital counter to the remaining side
of the input loop through connector.
1710J-Series Waveform Monitor
Television Test Signal Generator
Multiburst signal
Digital
Counter
Figure 7–4: Equipment setup to adjust 0.2
m
s timing
4. Set the multiburst generator to low, continuous, and manual. Turn markers
off.
5. Adjust the multiburst Frequency for a 5 MHz sine wave as measured on the
digital counter.
6. Change the multiburst generator to Composite.
7. Select 1 LINE sweep and turn on the MAG.
8. Adjust R553 for 10 cycles of subcarrier over 10 divisions
±
1 minor division.
Recheck multiburst generator frequency by switching it back to Continuous.
9. Disconnect the cable that goes to the digital counter and terminate the open
side of the CH A input with a 75
W
end-line terminator.
The component to adjust is A1R003.
1. Select 2 LINE sweep and turn the MAG off.
2. Hold the waveform monitor FILTER button in until both the FLAT and
LPASS indicators light.
Dual Filter Switching
Summary of Contents for 1710J Series
Page 4: ......
Page 14: ...Table of Contents x 1710J Series Waveform Monitors ...
Page 18: ...Service Safety Summary xiv 1710J Series Waveform Monitors ...
Page 22: ...Preface xviii 1710J Series Waveform Monitors ...
Page 23: ...Getting Started ...
Page 24: ......
Page 45: ...Operating Basics ...
Page 46: ......
Page 55: ...Reference ...
Page 56: ......
Page 64: ...Reference 3 8 1710J Series Waveform Monitors ...
Page 65: ...Specifications ...
Page 66: ......
Page 74: ...Specifications 4 8 1710J Series Waveform Monitors ...
Page 76: ......
Page 77: ...Theory of Operation ...
Page 78: ......
Page 100: ...Theory of Operation 5 22 1710J Series Waveform Monitors ...
Page 101: ...Performance Verification ...
Page 102: ......
Page 120: ...Performance Verification 6 18 1710J Series Waveform Monitors ...
Page 121: ...Adjustment Procedure ...
Page 122: ......
Page 138: ...Adjustment Procedure 7 16 1710J Series Waveform Monitors ...
Page 139: ...Maintenance ...
Page 140: ......
Page 169: ...Replaceable Electrical Parts ...
Page 170: ......
Page 204: ...Replaceable Electrical Parts 9 34 1710J Series Waveform Monitors ...
Page 205: ...Diagrams ...
Page 206: ......
Page 226: ......
Page 227: ...Replaceable Mechanical Parts ...
Page 228: ......
Page 240: ...Replaceable Mechanical Parts 11 12 1710J Series Waveform Monitors ...
Page 244: ...Glossary Glossary 4 1710J Series Waveform Monitors ...
Page 251: ......
Page 252: ......