![Teknion Complements Series Installation Manuals Download Page 516](http://html.mh-extra.com/html/teknion/complements-series/complements-series_installation-manuals_1076846516.webp)
Section:
Date: Sept 2019
SCREENS
Page: 4 of 7
COM_558
2.2
0.50
0.50
ALIGN SCREEN
STEP 2: Before fastening, align Screen to create a 0.5" gab between the Worksurface and
Screen. NOTE: Curved Radius Screen (GZCH) can be installed using pilot holes.
STEP 3: Attach width side of the Screen to the Worksurface using the Brackets and Screws
provided. Then flip depth side into position.
ATTACH SCREEN TO WORKSURFACE