![Teknion Complements Series Installation Manuals Download Page 292](http://html.mh-extra.com/html/teknion/complements-series/complements-series_installation-manuals_1076846292.webp)
Section:
Description:
Page No:
Date:
ARM COUNTERBALANCE LOAD ADJUSTMENT
CABLE MANAGEMENT
COM_210c
5 of 7
Sept 2017
Mast Dynamic Arm - Round Grommet
ERGONOMICS AND ACCESSORIES
STEP 9: Insert Cable in Arm Wire Clip located under Dynamic Arm. Squeeze Cable
management Clip on both sides to release it, drop cable on it then put it back. Lead cables into
Stanchion Clip, then insert it to the back of Stanchion.
STEP 8: Hold arm in desired position, adjust the Spring Loaded Counterbalancing Load on top
of Stanchion Hub until Arm stabilize at the position.
NOTE: Lead cables into
the Clip before clipping
to Stanchion.
J
Arm Wire Clip
Cable Management
Clip
Underside View
NOTE: Rotate Allen Key to "+"
direction for heavier monitor, "-"
direction for lighter monitor. Stop
until Arm stabilized at one
position.
Dynamic Arm supports from 8 to
30lbs.
Dynamic Arm Light supports from
2 to 13lbs.