ISOCONTROL: Service & Maintenance Manual - rev. 1.2
Pagina 5.25
5.3. FIRST POWER-ON
After completing the installation procedure, the machine is ready to be powered up. Proceed as
follows to switch on the machine:
1. Connect the mains lead to the power inlet socket on the machine.
2. Plug the mains lead into the wall outlet. The machine will automatically switch on; there is no
need to press any button. On power up the machine sounds a beep, the edges of the display
blink and the following details scroll through in sequence:
•
name of the machine on which the device is installed,
•
the software version,
•
the boot version,
•
version number of the integrated TGS reader,
•
language.
At the end, the machine enters the stand by state, awaiting a command from the keyboard.
During this phase the stand by messages scroll through the display.
3. At this point carry out the machine configuration procedure as described in chapter 9. “Machine
4. To check that the machine is working properly:
•
get on the machine;
•
insert a TGS key and check that the system is able to read it;
•
perform an exercise and check that the system detects the ROM and correctly acquires the
repetitions.
Summary of Contents for ISOCONTROL
Page 1: ...SERVICE MAINTENANCE MANUAL REV 1 2...
Page 2: ......
Page 4: ......
Page 42: ...ISOCONTROL Service Maintenance Manual rev 1 2 Pagina 5 26 Page intentionally left blank...
Page 52: ...ISOCONTROL Service Maintenance Manual rev 1 2 Pagina 6 36 Page intentionally left blank...
Page 58: ...ISOCONTROL Service Maintenance Manual rev 1 2 Pagina 7 6 Page intentionally left blank...
Page 60: ...ISOCONTROL Service Maintenance Manual rev 1 2 Pagina 8 2 Page intentionally left blank...
Page 71: ......