Table 5-2 Installation process description
Installation steps
Installation instructions
Reference
sections
Pre-installation preparations
Preparations need to be done before
the installation of TC500K3US-O:
1. Whether the product accessories
are complete
2. Whether the installation tools and
parts are complete
6 Installation
preparations
Mechanical installation
Mechanical installation includes:
1. Move the inverter
2. Install and fix the inverter
7 Mechanical
installation
Electrical connection
Electrical connection includes:
1. Open the front door and remove
the protective cover
2. DC side wiring
3. AC side wiring
4. Ground connection
Communication cable connection
8Electrical connection
Inspection after the installation
The inspected items include:
1.Mechanical installation inspection
2. Electrical installation inspection
3. Others
9Installation checklist
Power-on, commissioning
Commissioning includes:
1. Pre-commissioning inspection
2. Preparations before starting up
3. Initial operating steps
4. Completion of commissioning
10 Commissioning