9. Manual operation
Frame back/forward (feed by n-stitches)
9-9
Frame back/forward (feed by n-stitches)
This operation performs frame back/forward by input stitch count.
1.
Select mode (n stitch)
Setting value:1,10,100,C,nNeedle
1: 1 stitch unit
10: 10 stitch unit
100: 100 stitch unit
C: Color change unit
n: Stitch position inputted by
numerical key
2.
Input the stitch count
When the input stitch count is larger
than the current stitch count, frame
forward will be performed. When it is
smaller than the current stitch count,
frame back will be performed.
3.
Move the frame to stitch position
Pressing “SET” will cause the
machine to perform frame forward
(frame travel) to the inputted stitch
position.
4.
Completion
CAUTION
When performing this operation, do not put your hands
under the needle or on the machine table. If your hands are
under the needle or on the machine table, you may be
injured by the needle or the moving frame.
JZ05
* * * * * E M B P A U S E * * * *
T A J I M A 1 2 . D S T C
7 5 / 1 0 2 7
01/15:1 3456789AB<D>
2
Stitch
* * * * * E M B P A U S E * * * *
T A J I M A 1 2 . D S T n S T
7 5 / 1 0 2 7
01/15:1 3456789AB<D>
2
*** FORWARD/BACK ***
T A J I M A 1 2 . D S T n S T
* 3 5 6 / 1 0 2 7
01/15:1 3456789AB<D>
2
Set
* * * * * E M B P A U S E * * * *
T A J I M A 1 2 . D S T n S T
3 5 6 / 1 0 2 7
01/15:12345 789AB<D>
6
Summary of Contents for NEO TEJTII-C
Page 1: ...M IC2 01 E 2006 05 USER S MANUAL COMPACT SEWING MACHINE NEO ...
Page 11: ...1 6 1 Important warning items for safe operation Warning labels ...
Page 49: ...4 12 4 DATA SET MENU Initial memory ...
Page 54: ...6 DESIGN EDIT Size 6 2 Rotate 6 3 Mirror 6 4 Repeat 6 5 Edit JZ05 ...
Page 83: ...8 8 8 FRAME SETTING Trace ...
Page 95: ...9 12 9 Manual operation Frame back ...
Page 111: ...11 10 11 TROUBLESHOOTING AND MAINTENANCE Daily Maintenance ...