3. Basic operation
Program installation
3-7
6.
Select “INSTALL”.
Select “INSTALL” using right and left
keys.
7.
Start installation.
When installing plural programs, it is
possible to select plural installation
items by performing operations 5 and
6.
8.
Installation
9.
Installation is completed.
When the installation is completed,
turn “OFF” the power switch.
10.
Turn OFF the DIP switches DSW2-1 and DSW1-1.
11.
Attach the switch cover.
Machine setting has returned to the
initial setting. Change the machine
setting according to need.
If design data has been cleared, input
it again.
JZ05
****** INSTALL *****
1.MAIN -
2.XY -
3 PANEL -
.
Frame
Position
****** INSTALL *****
1.MAIN -
2.XY -
3 PANEL INSTALL
.
Set
****** INSTALL *****
1.MAIN INSTALL
2.XY -
3 PANEL INSTALL
.
****** INSTALL *****
PANEL
INSTALLING
[VVV ]
****** INSTALL *****
INSTALL FINISH
[POWER OFF]
1 2 3 4 5
6 7 8
ON
ON
1 2
3
1 2 3 4 5
6 7 8
ON
ON
1 2
3
DSW2
DSW1
Tighten the screw
Summary of Contents for NEO TEJTII-C
Page 1: ...M IC2 01 E 2006 05 USER S MANUAL COMPACT SEWING MACHINE NEO ...
Page 11: ...1 6 1 Important warning items for safe operation Warning labels ...
Page 49: ...4 12 4 DATA SET MENU Initial memory ...
Page 54: ...6 DESIGN EDIT Size 6 2 Rotate 6 3 Mirror 6 4 Repeat 6 5 Edit JZ05 ...
Page 83: ...8 8 8 FRAME SETTING Trace ...
Page 95: ...9 12 9 Manual operation Frame back ...
Page 111: ...11 10 11 TROUBLESHOOTING AND MAINTENANCE Daily Maintenance ...