RSA-G2 Getting Started Guide
Page 44
LN2 Controller Connection (optional)
1
Obtain the LN2 flex line from the LN2 accessory kit and connect between the LN2 Controller and a
liquid nitrogen supply source (bulk tank). Bulk tank needs to be a low pressure (22 psi) source.
2
Obtain the LN2 transfer line.
3
Connect the elbowed end of the transfer line to the LN2 Controller.
4
Connect the opposite end of the transfer line to the FCO LN2 supply connection.
5
Connect the power cable from the LN
2
Controller to the connector on the right side, above the
communications port.
Figure 25
FCO left- and right-hand configurations.
Summary of Contents for RSA-G2
Page 1: ......
Page 9: ...Forced Convection Oven with tension clamp Technology 8...
Page 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Page 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Page 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Page 30: ...Verso Filler Page z z...
Page 31: ...n getting Started guide Revision D Issued July 2022...
Page 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Page 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Page 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...