RSA-G2 Getting Started Guide
Page 41
Connecting Cables and Lines
To connect the cables and gas lines, you will need access to the RSA-G2 rear panel. All directional
descriptions are written on the assumption that you are facing the back of the instrument.
CAUTION: Connect all cables before connecting the power cords to outlets. Tighten the
thumbscrews on all computer cables. Whenever plugging or unplugging power cords, handle them
by the plugs, not by the cords.
MISE EN GARDE: Raccordez tous les câbles avant de connecter les cordons d'alimentation aux
prises. Serrez les vis à serrage à main sur tous les câbles d'ordinateur. Chaque fois que vous bran
-
chez ou débranchez les cordons d'alimentation, tenez-les par les fiches et non par les cordons.
Connecting the Modular Power Supplies
Stackable power supplies are used with the RSA-G2 to house various printed circuit boards and electrical
components. They provide power and communication with the instrument. Follow these instructions to
connect the power supplies to the instrument and accessories.
WARNING: Protect power and communications cable paths. Do not create tripping hazards by
laying the cables across access ways.
AVERTISSEMENT: Protégez les chemins de câble électriques et de câbles de télécommunica
-
tion. Ne créez pas de risques de déclenchement en posant des câbles sur les voies d'accès.
Summary of Contents for RSA-G2
Page 1: ......
Page 9: ...Forced Convection Oven with tension clamp Technology 8...
Page 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Page 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Page 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Page 30: ...Verso Filler Page z z...
Page 31: ...n getting Started guide Revision D Issued July 2022...
Page 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Page 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Page 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...