Page 61
Installing the Upper Geometry
To install an upper geometry follow these steps:
1
Loosen the set screws on the transducer mount using the Allen wrench supplied in the geometry kit.
2
Obtain the desired geometry. Make sure there is no dirt or dust at the location surfaces for parallel and
concentric alignment. Holding the geometry by the shaft, align the notch on the geometry with the slot
on the transducer mount and insert the geometry into the transducer mount. Refer to
for notch
and slot locations. Hold the geometry in place.
3
While holding the geometry in place, tighten both set screws. The set screw head will move inward to
hold the geometry in place. See the figure below.
Figure 36
Upper geometry installed on RSA-G2.
Geometry shaft
Notch aligned properly in slot
Set screws
Geometry baffle
Summary of Contents for RSA-G2
Page 1: ......
Page 9: ...Forced Convection Oven with tension clamp Technology 8...
Page 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Page 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Page 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Page 30: ...Verso Filler Page z z...
Page 31: ...n getting Started guide Revision D Issued July 2022...
Page 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Page 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Page 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...