![T-Drill F-400 Instruction Manual Download Page 50](http://html1.mh-extra.com/html/t-drill/f-400/f-400_instruction-manual_3075621050.webp)
INSTRUCTION MANUAL
50
In cold flanging one-, two- or three-phase flanging can be used. Multi-phase flanging is
used especially with small pipe dimensions and thin-walled pipes. Selection of the multi-
phase forming process can be done with a flanging mode select switch.
Multi-phase flanging means that the forming cone does not accomplish the forming
motion to the end but returns to the beginning once or twice. This return motion presses
away the fold, which reduces the flow area of the pipe.
14. Press the CYCLE START button
and machine carries out the flanging cycle.
The spindle stops automatically in correct position. If not, rotate it to correct position by
pressing the drum rotation push button
.
(Press the drum rotation push button briefly until drum is positioned to limit.)
If the spindle doesn’t revolve smoothly or if it stops, interrupt the work cycle
immediately by pressing EMERGENCY STOP).
Measure the flange, make necessary corrections and then enter to the setting value
table.
6.6 COLD FLANGING AND FLARING OF THE PIPE
The work cycle of the cold flanging and flaring.
1. Choose the correct forming pin and install it..
2. Fasten the pipe.
3. Carry out the settings of the forming tool and select suitable program from display.
L
DANGER! Before starting the automatic work cycle, make sure that the
pipe has been clamped properly.
L
DANGER! If the spindle does not rotate evenly or it stops, interrupt
the work cycle immediately by pressing the EMERGENCY STOP button
completely down.
4. Press the “CYCLE START”
push-button. The machine will perform an automatic
work cycle. When the work cycle is finished, the spindle will stop in its correct position -
ready for the following work cycle to be carried out.
¨
NOTE! After flanging the pipe end may be hot.
5. Loosen the flanged pipe, inspect its measures and if unsatisfactory, make the necessary
corrections in the set values.