![T-Drill F-400 Instruction Manual Download Page 39](http://html1.mh-extra.com/html/t-drill/f-400/f-400_instruction-manual_3075621039.webp)
FLANGING MACHINE
39
F-400
Lift the pipe clamps into clamping jaws, use gloves to protect your hands. If you are
using clamps bigger than Ø 219.1, you must use clamp lifting tool for easier changing (for
normal clamps only), for instructions see separate manual for clamp lifting tool.
Installation of the pipe clamp or clamp adapter: 1. Locking pins, 2. Pipe clamps, 3. Clamp
jaws.
11. Replace the buffer plates according to the wall thickness. The plates are located on
the guide bars. Open lock screw and pull the pin out together with back-up plates. Insert
correct thickness of back-up plates and lock with screw.
Change of the buffer plates. 1. Buffer plate location, 2. Lock screw, 3. Buffer plate
The thickness (N) of the plate chosen:
- For cold flanging S < N < S+2 S = wall thickness
- For hot flanging S + 2 < N ≤ 2S N = thickness of the back-up plate
See also control elements from chapter 6.1, buffer plates are delivered with the machine.
Spare number for buffer plate set: 4401438
12. Power on (hydraulic motor on).