![T-Drill F-400 Instruction Manual Download Page 5](http://html1.mh-extra.com/html/t-drill/f-400/f-400_instruction-manual_3075621005.webp)
FLANGING MACHINE
5
F-400
10.3 Approximate Operation Times of Flanging
.................................................................68
10.3.1 Fixing of the Pipe into the Clamp
........................................................................68
10.3.2 Flanging (machine time)
.......................................................................................68
10.4 Installation Times
........................................................................................................69
10.5 Loose Flange Joint
.......................................................................................................70
10.5.1 Lapped Joint
.........................................................................................................70
10.5.2 Loose Flange
.........................................................................................................70
10.5.3. Gasket
.................................................................................................................70
11. Troubleshooting .........................................................................................................
72
12. Ordering spare parts ..................................................................................................74