-
82
The correct and logical order for building a project is to begin from the bottom of the flow chart as
follows:
Mandatory
• Input
• Test
• Transaction (Test + Input)
• General (Transaction to Function Key)
• Weekly (General to day of week)
Optional
• Employee, Valid, Non valid - optional
• Messages
• Time Zone (to be linked to an employee)
• Printer notes (i.e.: for meal labels)
• Day Light Saving Time
• System
• Scheduler- for relay/modem activated function keys
• Project info - general information which is not transmitted to the terminal
Messages
Fixed system messages. These messages can be edited or re-written.
Summary of Contents for SY-760
Page 1: ......
Page 39: ...37 DIRECT RS 232 MULTI DROP RS 485 CONNECTION...
Page 57: ...55 COMPONENT SIDE PCB NO 770888 01 D...
Page 58: ...56 PRINTED SIDE PCB NO 770888 01 D...
Page 59: ...57 DISPLAY CARD...