AMI Powercon
Installation
A-96.250.341 / 061015
25
3.3.2
FEP Tube at Sample Outlet
FEP flexible tube 6 mm for AMI Powercon Specific.
Connect the tube to the serto elbow union and Insert it into an at-
mospheric drain of sufficient capacity.
Max. tube length is 1.5 m. Do not connect longer tubes.
1/2” Tube at waste funnel for AMI Powercon Acid
Connect the 1/2” tube [C] to the hose nozzle [B] and place it into the
atmospheric drain.
A
B
C
D
Ellbow union
Compression ferrule
Knurled nut
Flexible tube
A
B
C
Waste funnel
Hose nozzle
1/2” tube
B
C
D
A
A
B
C