AMI Powercon
Maintenance
A-96.250.341 / 061015
55
1
Stop sample flow to the monitor AMI Powercon by closing the
appropriate valve, e.g. back pressure regulator, sample prepa-
ration or flow regulating valve at flow cell.
2
Connect sample line of the Monitor AMI Powercon [A] with the
sample inlet of the reference instrument AMI INSPECTOR Con-
ductivity. Use the supplied tube, made of FEP.
3
Connect sample outlet of the reference instrument
AMI INSPECTOR Conductivity to the sample outlet funnel of
the monitor.
4
Switch on AMI INSPECTOR Conductivity. Open the flow regu-
lating valve and regulate the sample flow to 5-10 l/h. The actual
flow is shown on the transmitter.
A
B
C
Monitor AMI Powercon
Online flow cell
AMI Inspector Conductivity
D
E
F
Reference flow cell
Sample inlets withe T-fitting
Sample outlets
A
B
C
D
E
F