AMI Powercon
Maintenance
A-96.250.341 / 061015
43
6.
Maintenance
WARNING
Stop operation before maintenance.
Stop sample flow.
Shut off power of the instrument.
6.1.
Maintenance Schedule
Preventive maintenance frequency depends on water quality, on
the application, and on national regulations.
Control of certain set-point: Swimming pools, sanitary water:
Reagent
consumption
A 1 l resin bottle, delivered by Swan lasts at 1 ppm alcalizing re-
agent (pH 9.4) for:
4 months at sample flow 10 l/h
5 months at sample flow 5 l/h
6.2.
Stop of Operation for Maintenance
1
Stop sample flow.
2
Shut off power of the instrument.
Monthly
Check sample flow.
If the monitoring of resin has been switched off:
Check cation exchanger resin. The resin color
changes to red/orange if exhausted.
If required
clean conductivity sensors
Replace filter
Replace deaeration tubes