![Swann AMI Codes-II Operator'S Manual Download Page 39](http://html1.mh-extra.com/html/swann/ami-codes-ii/ami-codes-ii_operators-manual_1411948039.webp)
AMI Codes-II
Instrument Setup
A-96.250.571 / 050517
37
4.6.
Calibration
1
Calibrate pH sensor (if option pH is installed).
.
2
Perform process calibration.
Process Calibration of DIS, p. 50
If ordered:
Calibration of
pH sensor
The instrument should be operating for 1h before performing a pH
calibration.
Program the two buffers you want to use for calibration (Installation/
Sensors/Standards). Calibrate the pH sensor with two buffers, e.g.
pH 7.00 and pH 9.00. See chapter
for details.
Process DIS
Let the instrument run for 1 h.
Use CHEMATEST 25 (or equivalent photometer) to determine the
sample disinfectant concentration. Take the sample directly from
the flow cell. Determine the sample disinfectant value by 3 manual
DPD measurements. Calculate the average value. Compare this
value to the value, indicated by the AMI.
Keep in mind the accuracy of your manual measurement. Only cor-
rect the instrument if the difference is significant.
Perform process DIS if necessary. See chapter
for details.