A-96.250.511 / 091120
AMI Turbiwell
Program List and Explanations
91
3.6.2.22
Calendar
:
3.6.2.22.1
Start time: The programmed start time is valid for each of the pro
-
grammed days.
3.6.2.22.2
Monday
: Possible settings, on or off
to
3.6.2.22.8
Sunday
: Possible settings, on or off
3.6.2.3
Duration
: see Interval
3.6.2.4
Delay:
see Interval
3.6.2.5
Signal Outputs:
see interval.
3.6.2.6
Output/Control:
see interval.
The automatic draining is switched off.
The draining is controlled via input.
3.6.2.3
Duration
: see Interval
3.6.2.4
Delay:
see Interval
3.6.2.5
Signal Outputs:
see interval.
3.6.2.6
Output/Control:
see interval.
The draining is controlled via Fieldbus.
3.6.2.3
Duration
: see Interval
3.6.2.4
Delay:
see Interval
3.6.2.5
Signal Outputs:
see interval.
3.6.2.6
Output/Control:
see interval.
3.1 Process Cal. ppm
3.1.1
Detect Zero:
1
st
calibration point. Determination of the zero-point in a
sample without component to be calibrated.
3.1.2
Specify Slope:
2
nd
calibration point. A sample with known concentra
-
tion of component to be calibrated is used to determine the slope.
Note:
See chapter
ppm Calculation, e.g. “Oil in water”, p. 48
further details.
3.6.2.1
Off
3.6.2.1
Input
3.6.2.1
Fieldbus
Available if ppm is chosen, see menu