A-96.250.511 / 091120
AMI Turbiwell
Installation
29
3.5. Installation of Flowcontroller Option
Preparations
1
Push the locking pin [D] upward to unlock the measuring
chamber.
2
Swivel the measuring chamber [G] out.
3
Remove the sample inlet tube from the elbow hose nozzle [A].
4
Unscrew and remove the screw [J].
5
Remove the locking plate [I].
6
Unscrew the elbow hose nozzle [A] from the constant head.
A
D
G
Elbow hose nozzle
Locking pin
Measuring chamber
I
J
Locking plate
Screw
A
G
D
I
J