A-96.250.511 / 091120
AMI Turbiwell
Maintenance
70
Preparation
before use
Before inserting the verification kit into the measuring chamber, per
-
form the following steps:
1
Shake to obtain a homogeneous mixture.
2
Place the cuvette as shown below. Tap against the cuvette to let
all air rise to the top.
3
Turn the cuvette counterclockwise.
4
Make sure that all air is in position [H]. There must be no air bub
-
bles on the windows [C] and [E].
5
Installation of the Verikit, p. 68
and
Refilling
Before filling with a new standard, fill the cuvette with water and
shake well to remove all residues. After each refill, the matching pro
-
) must be repeated.
F
Air bubble
G
Standard
C
E
Window (light beam in)
Window (light beam out)
G
H
Standard
Air bubble
F
G
H
G
C
E