![Swan Analytical Instruments AMI Turbiwell Operator'S Manual Download Page 31](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-turbiwell/ami-turbiwell_operators-manual_1411373031.webp)
A-96.250.511 / 091120
AMI Turbiwell
Installation
31
Overview
Installation
12
Screw the Flowcontroller [C] to the panel.
13
Connect the tube supplied with the installation kit to the sample
outlet of the Flowcontroller and to the sample inlet [E] of the con
-
stant head.
14
Connect the sample inlet tube to sample inlet [A] of the Flowcon
-
troller. Depending on the inlet pressure, secure the tube to the el
-
bow hose nozzle [A] with a clamp.
15
Push the locking pin upward and swivel the measuring chamber
back.
16
Make sure that the measuring chamber rests in locked position.
A
B
C
D
Sample inlet of Flowcontroller
Capillary
Flowcontroller
Locking pin
E
F
G
H
Elbow fitting
Manual drain valve
Measuring chamber
Panel
C
B
A
D
E
F G
H