MAINTENANCE PROGRAM
PILATUS PORTER PC6
CHAPTER 3
MAINTENANACE PROCEDURES
DOCUMENT NO.:
SAP 27
Reissued: 2
Revision: 1
Date: July 2020
Page: 3 - 6
3.5. REQUIRED INSPECTION ITEM
a. Required Inspection is defined as inspection work items which, if improperly done
or if improper part is used, could endanger the safe operation of the aircraft. Susi
Air will identify RII item and written in the Work Order.
NOTE
: The individual performing a required inspection may be the employees
of an approved aircraft maintenance organization, in which case both
certifications will be made on behalf of the approved organization.
NOTE
: No person may release required inspection if he performed the items of
work required to be inspected.
b. List of Required Inspection Item
Any assembly, system or appliance the function of which is such that its failure
could prejudice the safety of an aircraft when undergoing maintenance or
modification is subjected to a Required Inspection Items.
Each Required Inspection Item will be specifically identified by ‘RII’ on every work
order/form on work packages.
ATA
REQUIRED INSPECTION ITEM
27 FLIGHT CONTROLS
Installation of the Primary Flight Controls System.
32 LANDING GEAR
Installation of the Landing Gear.
61 PROPELLER
Installation of the Propeller Assembly.
71
POWER PLANT
Installation of the Engine Assembly.
- FCU Installation
Note: List of Required Inspection items reference Company Maintenance Manual
Chapter 3.19.3.
3.5.1 Required Inspection Item Procedures
RII procedures are regulated by Company Maintenance Manual Chapter
3.19.2.
3.5.2 Anomalies Condition During Inspection
Sometimes during inspection, it is found some problems or defects whether it is
on the airframe or the engine. Susi Air will record all the anomalies condition
including the action taken to rectify the problems on Additional Worksheet
Summary of Contents for PILATUS PORTER PC6
Page 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Page 3: ......
Page 4: ......
Page 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Page 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Page 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Page 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Page 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Page 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Page 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Page 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Page 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Page 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Page 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Page 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Page 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Page 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Page 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Page 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Page 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Page 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Page 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Page 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Page 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Page 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Page 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Page 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Page 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Page 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Page 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Page 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Page 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Page 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Page 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Page 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Page 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Page 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Page 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Page 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Page 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Page 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Page 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Page 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Page 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Page 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Page 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...