MAINTENANCE PROGRAM
PILATUS PORTER PC6
CHAPTER 1
GENERAL
DOCUMENT NO.:
SAP 27
Reissued: 2
Revision: 1
Date: July 2020
Page: 1 - 3
1.4
SIGNATURE POLICY
1.4.1 Signing
The employee’s first name initial and full last name is required for signing of
work accomplished. Procedures on some forms shall require an Authorization
Card Number to be included with the signature. The instructions for completing
these forms contain this information. Work accomplished by Approved
Maintenance Organization (AMO) may be signed for in accordance with the
AMO and Procedures as acceptable to Susi Air’s Chief Inspector.
1.4.2 Corrections
To correct an error, draw a single line through the error and initial the correction.
Do not use white out for corrections.
All entries on all forms shall be made by
printing except for required signatures. Black ink is preferred, blue ink is
permissible.
1.5
INSPECTION TERMS AND DEFINITIONS
The following are terms and definitions related to this Maintenance Program:
CHECK
Compare a measurement of time, pressure, temperature,
resistance, dimension or
other quantity with a specific figure
for that measurement.
EXAMINE
Look at the condition of an item for damage, etc., as
follows:
Chafing
Contamination
Corrosion
Cracks
Deterioration
Discoloration due to overheating
Distortion
Faulty or broken locking devices.
Fractures
Fraying
Insecurity of attachment
Loose clips or fasteners
Loose or missing rivets
Leaks
Scoring
Wear
REMOVE
Disconnect a component or system and take it away from
its correct position.
INSTALL
Put a component in its correct position and attach it
correctly.
REPLACE
Remove an item and install a new or serviceable item in its
place.
Summary of Contents for PILATUS PORTER PC6
Page 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Page 3: ......
Page 4: ......
Page 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Page 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Page 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Page 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Page 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Page 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Page 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Page 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Page 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Page 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Page 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Page 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Page 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Page 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Page 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Page 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Page 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Page 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Page 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Page 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Page 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Page 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Page 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Page 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Page 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Page 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Page 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Page 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Page 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Page 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Page 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Page 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Page 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Page 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Page 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Page 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Page 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Page 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Page 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Page 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Page 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Page 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Page 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...