MAINTENANCE PROGRAM
PILATUS PORTER PC6
CHAPTER 5
INSPECTION TIME LIMIT
DOCUMENT NO.:
SAP 27
Reissued: 2
Revision: 1
Date: July 2020
Page: 5 - 1
5.1
TIME LIMIT MAINTENANCE REQUIREMENTS
The following table lists of Time Limit Maintenance Requirements which must be inspect at a
specific time. Where an interval is given in both flight time and calendar time, the limit which is
reached first must be applied.
ITEM
MAINTENANCE REQUIREMENT
INTERVAL
Chapter 24 - Electrical Power
Hawker Lead Acid Battery
(if installed)
Remove and capacity test
(ref. 24-32-11, Page Block 401 and
Battery CMM)
Initial test: 4500 FH
Or 18 months, then:
Subsequent tests at
750 FH or 3 months
Emergency Battery
Replacement
3 years
Capacity test
1 year
Operational test
3 months
Starter / Generator Brushes Check for wear
(Ref. 24-31 -11,Page block 601)
200 FH
Starter Generator
Lubrication
(AMM 24-31-11)
(EMM 72-60-00)
500 FH
Chapter 25 - Equipment and Furnishings
Halon Fire Extinguisher
P/N 959.08.06.211
(if installed)
Examine
Check Contents
1 year
Powder Fire
Extinguisher
P/N 959.08.01.352
or
P/N 959.08.01.354
(if installed)
Examine and weight
Max permitted weight loss is 10
grams (0.35 oz)
Check pressure
1 year
ELT
Operational Test
1 year
Altair ADAS
Examine
200 FH
Chapter 27 - Flight Controls
Aileron Control Cables and
Pulleys
Examine
(Ref. 27-00-00,
Page 601)
3500 FH or
7 years
Rudder Control Cables and
Pulleys
Examine
(Ref. 27-00-00,
Page 601)
3500 FH or
7 years
Elevator Control Cables
and Pulleys
Examine
(Ref. 27-00-00, Page 601)
3500 FH or
7 years
Summary of Contents for PILATUS PORTER PC6
Page 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Page 3: ......
Page 4: ......
Page 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Page 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Page 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Page 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Page 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Page 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Page 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Page 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Page 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Page 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Page 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Page 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Page 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Page 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Page 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Page 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Page 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Page 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Page 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Page 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Page 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Page 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Page 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Page 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Page 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Page 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Page 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Page 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Page 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Page 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Page 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Page 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Page 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Page 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Page 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Page 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Page 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Page 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Page 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Page 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Page 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Page 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Page 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...