Form No. ASI/MD-90
Revision 3 – July 2020
Page 8 of 8
NO.
DESCRIPTION
MECH. ENG.
8 If the answer to 7 above is NO then charge the battery for 13 Hours.
During the constant – current charge, the battery terminal voltage may rise as high
as 35 VDC, before the voltage will stabilize at approx. 31 VDC. This occurrence is
normal and will not degrade the battery.
9 After 13 hours remove the battery from the Test Set Up. Allow it to stand with no
further charging or discharging activity for at least 18 hours, before conducting
further tests.
10 Make the appropriate entry in the Inspection Work Package / additional worksheet,
that Main Battery Capacity check has been performed.
Attach a serviceable label with date of capacity check and store in accordance with
Hawker document F2602-0032 (24-32-35) Sealed Lead Acid Battery PN
9750W0538 procedures, until returned to service.
MAINTENANCE RELEASE
I hereby certify that aircraft parts and component mentioned above has been inspected and
maintained in accordance with the Maintenance Program and meets requirements of applicable
Civil Aviation Safety Regulations that is determined to be in an airworthy condition.
Name
: .......................................
Signature
: .......................................
Authorization Card’s No. : .......................................
Date
: .......................................
Summary of Contents for PILATUS PORTER PC6
Page 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Page 3: ......
Page 4: ......
Page 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Page 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Page 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Page 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Page 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Page 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Page 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Page 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Page 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Page 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Page 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Page 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Page 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Page 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Page 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Page 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Page 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Page 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Page 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Page 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Page 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Page 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Page 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Page 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Page 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Page 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Page 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Page 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Page 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Page 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Page 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Page 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Page 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Page 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Page 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Page 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Page 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Page 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Page 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Page 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Page 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Page 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Page 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...