When using the GBL-4DBT grounding lug, assemble the grounding lug to 

aluminum frame using stainless steel M5 screw and hardware as shown above.The 
star washer is fitted directly under the grounding lug and makes electrical contact  
by penetrating the anodized coating of the aluminum frame; the screw assembly a 
future fitted with a flat washer, then a split lock washer finally a nut to secure the entire 
assembley (see the picture above). Recommended M5 screw assembly torque is 1.5N-m. 
Next insert the ground wire (10-12 AWG exposed copper wire is recommended) to the 
feet of the lug, and screw down the slotted screw. Be carerful not to damage the wire 
core.
• 

For more information, please contact supplier: ILSCO, http://www.ilsco.com

To ensure optimum module performance, Suntech recommends the following 
maintenance measures:
• 

Clean the module minimum once a year or more often when required depending 

of the pollution. Remove all organic from the surface. Module with soiling or 
contamination may reduce the power generation of the system.  Always use clean 
water and a soft non-abrasive sponge or cloth for cleaning. A mild, non-abrasive 
cleaning agent may be used to remove stubborn dirt.
• 

Uncontrolled pollution is voiding the warranty or not cleaning the modules in time 

voids the warranty.
• 

Check the electrical, grounding and mechanical connections every six months to 

verify that they are clean, secure,undamaged and free of corrosion. Or else the warranty 
may be voided.
• 

In the event of a ground fault condition, NEVER wash or spray modules with water 

until ground fault has been identified, corrected by an authorized solar inverter service  
technician and the inverter is fully operational. This can cause electrocution or a serious 
safety issue.
• 

If any problem arises, consult a professional solar service providers for suggestions.

• 

Caution: observe solar manufacturers' maintenance instructions for all components 

used in the system, such as support frames, charging regulators, inverters, batteries etc.

Maintenance

No.14

No.15

Wuxi Suntech Power Co., Ltd.

Address: No.9 Xinhua Road, New District Wuxi, China 214028

Customer Service Hot Line: +86 400 8888 009 Fax: +86 510 8534 3321

E-mail: [email protected]

Or please contact our local representatives, details at www.suntech-power.com

No.16

No.15

T series - 1324 mm×992 mm×35 mm

Module

Optimum

Operating

Voltage

(Vmp) at

STC, (V dc)

Optimum

Operating

Current

(Imp) at

STC, (A dc)

Open

Circuit

Voltage

(Voc) at

STC, (V dc)

Short

Circuit

Current

(Isc) at

STC, (A dc)

Maximum

Power

(Pmax) at

STC, 

(Watts)

Maximum

System

Voltage 

(IEC/UL)

Maximum

Series

Fuse

Rating

STP225S-16/Tem

25.2

8.93

31.4

9.41

225

1000/600

20

STP220S-16/Tem

24.9

8.84

31.1

9.34

220

1000/600

20

STP215S-16/Tem

 24.6

8.75

30.8

9.28

215

1000/600

20

STP210S-16/Tem

24.3

8.65

30.5

9.22

210

1000/600

20

STP205S-16/Tem

24.0

8.55 

30.2

9.16

205

1000/600

20

STP200S-16/Tem

23.7

8.45

29.5 

9.01

200

1000/600

20

STP185S-16/Tem

22.8 

8.12 

29.1

8.92

185

1000/600

20

Summary of Contents for STP185S-16/Tem

Page 1: ......

Page 2: ... General installation Installation method Attachment guidelines 11 Electrical Installation General installation Grounding 14 Maintenance No 1 Global Installation Guide for Suntech Power Photovoltaic Module Version 20150101 Please read carefully This document is binding for any warranty case Any installed PV system less than 500m from coastline please refer to the Near coast installation manual ...

Page 3: ...d to as module Wuxi Suntech Power Co Ltd referred to as Suntech Installers must read and understand this guide prior to installation For any questions please contact Suntech s Global Quality Customer Support department or our local representatives for more detailed information Installers must follow all safety precautions as described in this guide as well as local requirement and regulations by l...

Page 4: ...ling mechanical and electrical components Completely cover the module with an opaque material during installation to prevent electricity from being generated Do not wear metallic rings watchbands earrings nose rings lip rings or other metallic objects while installing or troubleshooting photovoltaic systems Follow the safety regulations eg safety rules for working on electrical power plant station...

Page 5: ... of 10 cm between the roof plane and the frame of the module is generally recommended Always observe the instructions and safety precautions included with the module support frames No 6 This installation manual is applicable for all pv system of 500 m or more away from the coastline If you need to install your system less than 500m from the coast line please refer to Near coast installation manual...

Page 6: ...es W series V series module No 9 2400 Pa Load 2400 Pa Wind Load 2400 Pa Snow Load 3800 Pa Load 3800 Pa Wind Load 3800 Pa Snow Load 5400 Pa Load 5400 Pa Snow Load 3800 Pa Wind Load Mounting system Clamping system Attachment to the long frame Length Use four clamps Use four clamps Use six clamps Clamping system Attachment to the short frame Use four clamps on short frame Use four clamps on the short...

Page 7: ... void the warranty It is not recommended to use modules with different configurations grounding wiring in the same system Excessive cables must be organized or fixed in an adequate way e g attached to the mounting structure by using non metallic cable ties Solar cables connectors and juction boxes should not be exposed to water exposure and snow and rain or water submersion for a long period of ti...

Page 8: ...al hand over to the owner including an installation protocol is required Provide a clear documentation of the system to the owner consisting of following minimum data such as user guide system layout data sheets performance expectations electrical system data e g a copy of the installation test report following minimum requirements of IEC 62446 IEC 60364 6 Grounding For grounding and bonding requi...

Page 9: ...ix months to verify that they are clean secure undamaged and free of corrosion Or else the warranty may be voided In the event of a ground fault condition NEVER wash or spray modules with water until ground fault has been identified corrected by an authorized solar inverter service technician and the inverter is fully operational This can cause electrocution or a serious safety issue If any proble...

Page 10: ... 1000 600 20 STP265 20 Wem 31 0 8 56 37 8 9 02 265 1000 600 20 STP260 20 Wem 30 9 8 42 37 7 8 89 260 1000 600 20 STP255 20 Wem 30 8 8 28 37 6 8 76 255 1000 600 20 STP250 20 Wem 30 7 8 15 37 4 8 63 250 1000 600 20 STP275S 20 Wem 31 1 8 85 38 5 9 34 275 1000 600 20 STP270S 20 Wem 30 8 8 77 38 3 9 28 270 1000 600 20 STP265S 20 Wem 30 5 8 69 38 1 9 22 265 1000 600 20 STP260S 20 Wem 30 2 8 61 37 9 9 17...

Reviews: