Most wind turbines are three-phase PM type. Therefore, either a wind turbine controller or a direct
connection to the MPPT via a simple protection circuit will be required.
Dump Load:
When the battery (battery bank) is fully charged and the water turbine/wind turbine/solar
module is still generating power, a dump load will provide the electricity a path to flow. This can be done
using a switch on by the smart load option or utilizing a wind turbine controller with a built-in dump load.
Also, the hot water tank controlled via smart load can act as a good dump load, but in very windy
conditions it may be necessary to shunt the output.
4.20. Advanced Settings for Auxiliary Load
To configure auxiliary load (previously known as smart load) settings click on the “Aux Load” icon.
What this page displays:
Use of the Gen (Aux) input or output.
What you can do from this page:
Set up a generator input.
Set up an auxiliary (smart) load.
Set up peak power shaving
Use an additional inverter or micro
inverter
Summary of Contents for G01LP1-US/EU