Hybrid Parity (Super) Inverter 3.6kW/5.5kW/8.8kW Plus Parallel Version
www.sunsynk.com
``
If an earth bond is required between neutral and earth and your system is a hybrid system then you can
have a permanent earth wire since this can cause faults with an RCD before the inverter.
Since the inverter is a true hybrid then the bond must only be made when the inverter is operating in
Islanding Mode. To accommodate this, Sunsynk provides an AC output, which is connected to the A/T/S
connections whenever the inverter is running on Island Mode. Therefore, you can simply connect the coil
of an AC relay to the ATS 240 connections. Next, you need to select Signal Island Mode on the battery
charge menu (click on the gear icon -> battery icon), as shown in the figure below.
You can test that there is a voltage when the inverter is disconnected from the grid by using a simple
multimeter.
3.5. Installing the CT Coil
The CT coil is one of the most important parts of the Sunsynk Parity inverter. This device reduces the
power of the inverter to prevent feeding power to the grid. This feature is also known as "Zero Export".
Fit the coil (sensor) around the live cable on the main fuse feeding the building and run the cable back
to the inverter. This cable can be extended up to an extra 10m using a similar cable.
Connect the other end of the CT coil into the inverter terminals marked as CT coil
NOTE
The grid may still be present, but the inverter is not draining power from it since the unit is working in