24
ASu ... CW2
280
480
700
850
1090
Ø Kaltwasserleitung, bauseits [mm]
28
35
42
54
54
Außengewinde [Zoll]
1
1 1/4
1 1/2
2
2
Wassereintritt, Kreis 1
L1
Wasseraustritt, Kreis 1
L2
Wassereintritt, Kreis 2
L3
Wasseraustritt, Kreis 2
L4
Kondensatablauf
L5
Elektro-Einspeisung
R8
Befeuchterzu-/ablauf
R5
l1 l2
l4
l3
l5
r1
r5
r4
r8
EN/06.2017/G18D © STULZ GmbH – all rights reserved
cyberair 3PrO cw2 Original instructiOns
5.3.2 Pipe entrance area - upflow units
For the routing of the piping into the unit there are several possibilities. The most favourable openings are
those which are recommended in the tables. The lines for the power supply, the humidifier connections and
the condensate drain can be routed through the remaining openings as desired.
Connection from the left
Connection from the right
ASu ... CW2
Ø chilled water line, by client [mm]
external thread [inch]
water inlet, circuit 1
water outlet, circuit 1
water inlet, circuit 2
water outlet, circuit 2
condensate drain
power supply
humidifier inlet/outlet
The openings R1
and R4 can not be
used.