9. Powering the System
9.1
Halogen Lights
9.1.1
Electrical and Data Connections
The electrical system consists of the following parts:
•
Wall control box
•
Power supply box
•
Electronics in light head
1. Mount the wall control box into back box and connect the two cables. Top cable is for Light
One (black connector), bottom connection is for Light Two (white connector) and the camera
controls.
Power Supply Box (Front and Rear View)
2. Place the power supply box
into designated the location
in the documentation station.
The front of the power supply
box has the video connections,
RS-232 connections, and the
low voltage connections to the
lights. The rear has an IEC con-
nector for 115/230VAC power
cord. Additionally a 24VDC
safety power connection is pro-
vided for countries with this
requirement.
Note
Proper positioning of the light Power supply box in the Documentation Station
with cable connections in the front.
3. Connect the two cables from the wall control box to the proper connectors.
4. Connect the surgical lighting low voltage and listen for an audible click to confirm proper instal-
lation.
5. Connect the data cables to the power supply box.
6. Connect hospital-provided 24 VDC backup power to provided connector (if applicable).
Note
Have the hospital designated contractor connect the high voltage cord to the
junction box they installed for Light/ Flat Panel models only. Stryker will not
make high voltage connections. Do not close the circuit breaker yet.
7. Connect low voltage leads from the power supply box to connections at the top of the surgical
lighting suspension.
Summary of Contents for MMP200
Page 2: ......
Page 4: ......
Page 106: ...106 S Front View of Connector ...
Page 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Page 148: ...148 S ...