![Stryker MMP200 Installation And Service Manual Download Page 21](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968021.webp)
21
S
6.2.3
Alternate Light Installation Instructions
1. Load the suspension shipping box onto a heavy machinery lift device.
2. Cut cardboard 9 inches from the top of the box to facilitate hanging suspension. Be careful not
to cut cables or scratch the suspension.
Hex Nut
Flat Washer
Hex Nut
Lock Washer
Note
When necessary, Plastic Isolation Discs surround the mounting plate, but are only
required in Europe.
3. Raise the down tube toward the mount site.
4. Guide the all-thread rods through the holes located on the down tube flange.
The down tube flange must press lightly against the hardware assembly.
5. Place a flat washer on alternating all-thread rods followed by a hex nut; tighten the hex nut.
6. Use a Torpedo Level to verify the down tube flange is level across three horizontal planes. If the
flange is not level, adjust the hex nuts until the Torpedo Level indicates the down tube flange
is level across three horizontal planes. Confirm that the down tube is also level by placing the
Torpedo Level on the down tube at three, evenly-spaced locations.
7. Install a flat washer, lock washer, and hex nut on the remaining all-thread rods.
Note
Plastic Isolation Discs are only required in Europe.
8. Tighten the hex nuts to 75 ft-lbs. Ensure the lock washers are fully compressed.
9. Remove the hex nuts from the all-thread rods applied in step 5 and install a lock washer and hex
nut.
Summary of Contents for MMP200
Page 2: ......
Page 4: ......
Page 106: ...106 S Front View of Connector ...
Page 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Page 148: ...148 S ...