![Stryker MMP200 Installation And Service Manual Download Page 104](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968104.webp)
104
S
Plug Allocation Power Box
16.5.4 Connections at the front:
Plug-in connection light control for lights 1 + 2
Pin No.
1. CAN -
2. CAN screen
3. CAN +
Plug-in connection light power for lights 1 + 2
Pin No.
1. Supply lights -
2. PE / protective grounding
3. Supply
Plug-in connection wall control for lights 1 + 2
Pin No.
1. Supply te
2. RS-232, RXD
3. RS-232, TXD
4. Not Connected / Reserved
5. Supply GND
6. Supply te
Summary of Contents for MMP200
Page 2: ......
Page 4: ......
Page 106: ...106 S Front View of Connector ...
Page 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Page 148: ...148 S ...