![Stryker MMP200 Installation And Service Manual Download Page 26](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968026.webp)
26
S
7. Install a flat washer, lock washer, and hex nut on the remaining all-thread rods.
Note
Plastic Isolation Discs are only required in Europe.
8. Tighten the hex nuts to 75 ft-lbs. Ensure the lock washers are fully compressed.
9. Remove the hex nuts from the all-thread rods applied in step 10 and install a lock washer and
hex nut.
10. Use a Torpedo Level to verify that the down tube flange is level across three horizontal planes.
11. Connect the ground wire (found on the down tube flange) to the ground lug located in the ceil-
ing.
12. Lower the lift device and check the suspension for stability.
13. Pull excess cable through conduit.
7.1
Alternate Light Installation Instructions (Continued)
1. Using a lift device, raise the suspension into the down tube.
2. Pull all cables and electrical connections through the Mounting (Interface) Plate. If ORIS con-
nectivity is going to occur at a later date, tie-wrap cable kit to down tube flange.
3. Pull excess cable through conduit.
4. Mount down tube onto suspension. Use the six flat head socket cap screws (taped to down tube)
to attach the down tube to the central axis spindle. Tighten all screws with a torque wrench set
to 100 lb-in (8.33 lb-ft, 11.3 Nm). Once all screws have been tightened,
retighten
each screw to
ensure correct torque is set.
Note
For EHA
- Tighten all screws with a torque wrench set to 354 lb-in (29.5 lb-ft, 40
N-m).
If you are installing a flat panel along with a dual light suspension, verify that the flat panel cable
kit is routed through the opening in the down tube.
5. Take care when raising the suspension to prevent pinching cables between the down tube and
suspension.
Summary of Contents for MMP200
Page 2: ......
Page 4: ......
Page 106: ...106 S Front View of Connector ...
Page 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Page 148: ...148 S ...