![Stryker MMP200 Installation And Service Manual Download Page 25](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968025.webp)
25
S
7. Installing the Suspension and Boom Arms
Hex Nut
Flat Washer
Hex Nut
Lock Washer
Note
When necessary, Plastic Isolation Discs surround the mounting plate, but are only
required in Europe.
1. Raise the Suspension assembly toward the mount site.
2. Take care when raising the suspension to prevent pinching cables between the all-thread rods
and down tube.
3. Guide the all-thread rods through the holes located on the down tube flange.
The down tube flange must press lightly against the hardware assembly.
4. Pull all cables and electrical connections through the Mounting (Interface) Plate. If ORIS con-
nectivity is going to occur at a later date, tie-wrap cable kit to down tube flange.
5. Place a flat washer on alternating all-thread rods followed by a hex nut; tighten the hex nut.
6. Use a Torpedo Level to verify the down tube flange is level across three horizontal planes. If the
flange is not level, adjust the hex nuts until the Torpedo Level indicates the down tube flange
is level across three horizontal planes. Confirm that the down tube is also level by placing the
Torpedo Level on the down tube at three, evenly-spaced locations.
Summary of Contents for MMP200
Page 2: ......
Page 4: ......
Page 106: ...106 S Front View of Connector ...
Page 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Page 148: ...148 S ...