LIFEPAK
®
20
Performance Inspection Procedure (PIP)
3201896-000_B
©2019 Stryker
Page 47 of 61
5. Establish the setup as shown in Figure 1.30b.
Note:
Ensure all connectors and connection points
are clean and are firmly attached. If not, you will
see higher readings from the safety analyzer.
6. Ensure the device is off.
7. Measure the resistance of device with the AC
power cord per figure 1.30b. Record the resistance
value on the PIP checklist.
8. Calculate the resistance of device only by
subtracting the value obtained in Step 4 from the
value obtained in Step 7. The calculated value
must be less than
0.2 ohms. Record the calculated
value on PIP checklist.
(1)
(2)
LP20 DEVICE REAR
Figure 1.30b