
LIFEPAK
®
20
Performance Inspection Procedure (PIP)
3201896-000_B
©2019 Stryker
Page 5 of 61
The PIP applies to the LIFEPAK 20 Defibrillator exclusively. To complete the PIP, you must perform the manual test outlined in the
PIP
- Instructions
below. All PIP tests must be performed from start to finish in the order presented.
Refer to the
PIP - Resource Requirements
for a listing of the necessary qualifications for PIP equipment, test equipment verification,
workstation power.
Refer to the
PIP - Test Equipment Requirements
for a listing of test equipment, including specifications, required to complete the PIP.
Use the
PIP - Checklist
to record your results.
This section describes the requirements for PIP equipment, PIP test equipment verification, PIP workstation power.
To perform the PIP, you must use the equipment listed in the
PIP - Test Equipment Requirements
table. Although the table lists
specific test equipment by manufacturer, test equipment with equivalent specifications may be substituted. Refer to the test equipment
manufacturer’s operating instructions for usage details where not specifically covered herein.
All test equipment used to perform the PIP must have a current calibration label. The calibration label must be issued by a certified
calibration facility.
The AC line power to the workstation must be connected to a grounded power source.