PIP - Leakage Current Test Setup
Establish the Leakage Current Test setup as shown in Figure 1.28:
WARNING
POSSIBLE EQUIPMENT DAMAGE
Do not defibrillate when connected to the safety analyzer!
1. Connect the Banana cable (Item 6) between the Safety Analyzer ESA612 (at V/ohms/A) and the Ground stud.
2. Connect the customer ECG Lead cable (Item 1) between the LIFEPAK 20 and the 1210 box. Connect Item 5 between the 1210 box
and the Safety Analyzer ESA612 at RA snap.
Note:
The customer ECG cable is 5-Wire or 3-Lead.
3. Connect the Therapy cable (Quik Combo (Items 2 and 3) or Standard Paddles (Item 8) between the LIFEPAK 20 and the Safety
Analyzer ESA612 at LL and LA snaps.
4. Connect the SPO2 cable (Item 4) between the LIFEPAK 20 and the Safety Analyzer ESA612 at RL snap.
5. Connect the AC power cable (Item 7) between the device and the Safety Analyzer ESA612 at AC output.