Fit
the
socket
head
capscrew
to
the
non
‐
spring
side
inserting
the
plastic
washer
between
the
two
halves
of
the
rope
band.
Tighten
to
1.5Nm.
Position
the
inner
band
assembly
over
the
rope
such
that
2
free
rope
coils
remain
unclamped
and
tighten
the
capscrew
on
the
spring
side
1.5Nm
(see
Figure
42).
1
Ensure
all
slack
rope
is
removed
prior
to
tightening
inner
band
fixings.
It
should
not
be
possible
to
slide
or
rotate
the
inner
band
over
the
rope
without
using
excessive
force.
If
the
inner
band
is
moved
easily,
remove
one
or
both
plastic
washers
from
the
inner
band
joint.
Figure
42
–
Rope
Guide
Inner
Band
Fitted
Lightly
lubricate
the
location
groove
on
both
halves
of
the
outer
band
(see
section
5.7.1).
Fit
the
bottom
half
of
the
outer
band
(tapped
joint
holes)
over
the
inner
band
and
rotate
until
it
is
on
the
underside
of
the
barrel
ensuring
that
the
slot
collects
the
rope
which
leaves
the
barrel
(see
Figure
43).
Figure
43
–
Fitting
Rope
Guide
Outer
Band
Fit
the
top
half
of
the
rope
guide
over
the
inner
band.
Insert
the
four
socket
head
capscrews
and
screw
two
halves
together.
Tighten
to
1.5Nm.
FOR
STANDARD
ENVIRONMENT
ROPE
GUIDES
type
Rv
‐
1:
‐
Fit
the
rope
guide
retainer
to
the
face
of
the
rope
guide.
Tighten
the
screws
to
8Nm
(see
Figure
44).
Set
the
upper
and
lower
limit
switches
(see
Section
3.6)
Summary of Contents for ZX6
Page 2: ......
Page 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Page 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Page 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Page 101: ......
Page 102: ......