d
e
f
g
h
©
Street
Crane
Co
Ltd
Ref:
D3256
rev.
B
Page
61
of
103
5.8.2.5
Running
In
After
installation
of
a
new
rope
the
hoist
should
be
run
several
times
under
light
load
(approx
10%
of
SWL)
and
at
slow
speed
to
allow
the
wire
and
strands
of
the
rope
to
align
themselves
and
bed
down.
This
can
greatly
increase
the
rope
life.
5.8.2.6
Removing
twist
If
any
twist
is
imparted
in
the
rope
during
installation
the
bottom
block
will
rotate,
particularly
with
no
load
attached.
If
twisting
does
occur,
remove
the
rope
from
the
hoist
and
untwist
by
letting
the
rope
hang
freely
or
laying
the
rope
out
on
the
floor.
1
Remove
any
twist
before
the
hoist
is
subject
to
any
further
load.
The
rope
may
otherwise
be
permanently
damaged.
5.8.3
Fitting
the
Rope
Guide
Fit
the
top
and
bottom
halves
of
the
rope
guide
inner
band
over
the
rope
ensuring
correct
orientation.
NOTE:
the
reduced
diameter
of
the
Band
faces
TOWARDS
the
end
of
the
drum.
Figure
40
–Fitting
Top
and
Bottom
Halves
of
Rope
Guide
Inner
Band
Fit
the
socket
head
capscrew
and
spring
into
the
deep
counterbore
and
place
the
sleeve
and
washer
over
the
screw
as
shown
in
Figure
41
.
Loosely
tighten
the
socket
head
capscrew.
Figure
41
–
Rope
Guide
Inner
Band
Spring
and
Sleeve
Arrangement
End
of
Drum
Summary of Contents for ZX6
Page 2: ......
Page 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Page 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Page 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Page 101: ......
Page 102: ......