Figure
22
–
Traverse
Limit
Double
Girder
arrangement
(See
Figure
21
for
setting
dimensions)
When
setting
the
point
of
operation
for
the
limit
switch,
account
should
be
taken
of
the
hoist
speed
and
the
stopping
distance.
The
point
of
operation
should
be
set
to
allow
a
fully
loaded
crane
/
hoist
to
stop
from
fast
speed
before
reaching
the
required
position.