3.9
ULTIMATE
UPPER
LIMIT
SWITCH
–
HOOK
BLOCK
OPERATED
(OPTIONAL)
When
specified,
an
ultimate
upper
limit
may
be
fitted
to
the
hoist
unit
to
prevent
the
bottom
block
from
damaging
the
hoist
should
the
normal
upper
limit
switch
fail.
It
should
be
set
to
activate
at
the
upper
level
given
in
section
3.10.
The
normal
limit
should
then
be
set
to
activate
approximately
75
‐
100mm
below
the
ultimate
limit.
A
red
warning
light
on
the
base
of
the
control
panel
will
illuminate
to
indicate
when
the
second
ultimate
limit
has
been
activated.
Figure
19
–
Ultimate
Upper
Limit
Switch
–
Hook
Block
Type
3.9.1
Setting
the
ultimate
upper
limit
1
Extreme
care
must
be
exercised
when
testing
the
ultimate
limit
switch
as
it
necessary
to
by
‐
pass
the
normal
upper
limit.
Reposition
the
normal
upper
limit
such
that
the
ultimate
limit
is
the
first
to
operate.
Raise
the
hook
to
the
desired
operating
position
at
slow
speed
with
no
load
attached
allowing
an
additional
50mm
for
a
fast
speed
approach.
1
The
upper
hook
level
for
low
headroom
hoists
vary
with
the
runway
flange
width.
The
hoist
will
be
seriously
damaged
if
the
hook
is
set
higher
than
the
values
indicated
in
section
3.10.
Remove
the
bottom
block
trigger
fixings
such
that
the
bottom
block
trigger
can
be
split
in
two.
Position
the
bottom
block
trigger
around
the
hoist
rope.
1
The
bottom
block
trigger
must
be
positioned
around
the
static
rope
on
the
reeving
arrangement
i.e.
the
rope
which
passes
over
the
Diverter
sheave
see
Figure
19.
Replace
block
trigger
fixings.
Adjust
the
length
of
the
strainer
wire
and
position
of
the
bottom
block
trigger
such
that
the
limit
switch
operates
Test
the
operating
position
in
slow
speed
at
first
repeating
the
test
in
fast
speed
raising
/
lowering
the
bottom
block
trigger
where
necessary.
Trim
or
secure
any
excess
strainer
wire.
Check
that
the
red
warning
light
in
the
base
of
the
control
panel
illuminates.
Set
the
normal
upper
limit
so
that
it
operates
approximately
75
‐
100mm
below
the
ultimate
upper
limit
(see
3.6.2
).
Summary of Contents for ZX6
Page 2: ......
Page 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Page 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Page 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Page 101: ......
Page 102: ......